SQUARE AND RECTANGULAR HWS ENTERPRISE
ENTERS INTO CHINA TOP 500
MANUFACTURING ENTERPRISE

about us

Tianjin Yuantai Derun Pipe Manufacturing Group Co., Ltd., established in March 2002, is the biggest manufacturer specializing in  ERW square&rectangular tube/pipe, hollow section structure pipe, galvanized pipe and spiral welding pipe in China. Annual output reaches 5 million tons.Yuantai Derun has 59 production lines of black ERW pipe, 10 production lines of galvanized pipe and 3 production lines of spiral welding pipe. Square pipe from 20*20*1mm to 500*500*40mm, rectangular pipe from 20*30*1.2mm to 400*600*40mm,  welded pipe from 2”—60” can be manufactured. Yuantai Derun can manufacture square rectangular pipes as per the standards of ASTM A500, JIS G3466, EN10219, DIN2240, BS1387, AS1163.

Learn More >>
January 1993

Key team members of Yuantai Derun group began technical job in Tianjin Daqiuzhuang tube factory.

June 2002

Tianjin Yuantai Industry & Trade Co., Ltd. was founded, specialize in square, rectangular hollow steel pipe, hot galvanized welded (hot dip galvanized) square tube, the registered capital is USD 10 million.

May 2004

One of Yuantai subsidiaries Tangshan Lituo Steel Tube Co., Ltd. was established, specialize in square rectangular straight welded hollow steel pipe, registered capital is USD 10 million.

April 2005

Yuantai Steel Square Pipe Co. Ltd. was established, specialize in square welding hollow steel tube and galvanized tube, the registered is USD 2 million.

March 2010

Tianjin Yuantai Runxiang commercial trade company was established, specialize in strip steel trade, galvanized pipe agent, etc., the registered capital is USD 2 million.

March 2010

Tianjin Yuantai Derun pipe manufacturing group Co. Ltd. was formally established, marking that the production of high-frequency welded black, galvanized square pipe, spiral welded pipe, pipe logistics and pipe trade as one of the large-scale joint enterprise Yuantai Derun group was formally established, the group registered capital is USD 20 million.

March 2010

Tianjin Yuantai Derun Investment Co., Ltd. was formally established, specialize in steel pipe industry chain,lower industry mergers and acquisitions and industrial real estate development, the registered capital is USD 2 million.

August 2013

Tianjin Derun Runfeng pipe manufacturing Co. Ltd was established, specialize in hot galvanized (hot galvanizing) processing business, the registered capital is USD 8 million.

March 2015

Tianjin Yuantai Yuanda anti-corrosion insulation pipe Co., Ltd. was established, specialize in spiral welded pipe production and sales, the registered capital is USD 2 million.

August 2015

Tangshan Yuantai Derun Pipe Co., Ltd. was established, specialize in steel strip, steel pipe trade, registered capital is USD 1 million.

March 2016

Tianjin Yuantai Derun International Trade Co., Ltd was established,mainly engaged in international import and export business for Yuantai Group, registered capital is USD 2 million.

news

EXCEED EXCELLENT INNOVATION

Integrity

Rely on faith and trust to be achievement, make friends and be on the way all the time.

Innovation

Be low key but ambitious, look forward to the Era of Smart Production with intelligence, information and precision

Development

Create a century brand by the way of forging ahead and pursuing excellence

Dedication

Realize our vision and task, be valuable and feedback.

ZAM Steel Solar Mounting Structure-Zinc aluminum magnesium photovoltaic bracket-TIANJIN YUANTAI DERUN PIPE MANUFACTURING GROUP CO., LTD-
Zinc aluminum magnesium photovoltaic bracket

Home >> products >> Zinc Aluminum Magnesium Coating Products >> Zinc aluminum magnesium photovoltaic bracket

ZAM Steel Solar Mounting Structure
ZAM Steel Solar Mounting Structure
ZAM Steel Solar Mounting Structure
ZAM Steel Solar Mounting Structure
ZAM Steel Solar Mounting Structure
Surface treatment: galvanized zinc aluminum magnesium

Standard: EN10324, JIS G 3323-2012, ASTM A 1046
Processing: Ordinary processing and custom processing are available
Coating weight: ZM20-ZM400
Other accessories or requirements can be ordered.

Product Details:

Item

ZAM Steel Solar Mounting Structure

Surface Treatment

Galvanized zinc aluminum magnesium

Standard

EN10324, JIS G 3323-2012, ASTM A 1046

Coating weight

ZM20~ZM400

Processing

Ordinary processing and custom processing are available

Terms of payment

L/C, T/T

Delivery

7-30days

Supplying BV or SGS Inspection if the client needs it.

Other accessories or requirements can be ordered.

Surface treatment can be consulted in detail.



1. Specifications for the installation of ZAM steel solar mounting structure foundations

After the pile foundation enters the site and before construction, its appearance and quality are inspected.

The position of the pile foundation should be stable, and there should be no problems with inclination and offset during the installation of the pile foundation.

Check the pressure, pile verticality, and penetration depth during pile pressing.

During the construction of the pile foundation, the pile body should be kept vertical and should not be loaded eccentrically.

The depth control scale should be set on the drilling tool for the drilling of the cast-in-situ pile, and observation records should be made during the construction.

During the construction of the pile foundation, the whole process of hole formation, slag removal, reinforcement cage placement, and concrete pouring should be inspected.

Concrete should be poured as soon as possible after passing the quality inspection of Guanzhu Specialized holes.

The inspection of the strength and bearing capacity of the pile foundation shall be carried out in different regions according to the principle of controlling the construction quality.


2. Specifications for the installation of roof zinc-aluminum-magnesium photovoltaic support foundation

The foundation construction of the roof zinc-aluminum-magnesium photovoltaic support should not damage the main structure and waterproof layer of the building.

The zinc-aluminum-magnesium photovoltaic support foundation of new buildings is suitable for construction together with the main structure.

When the steel structure is used as the foundation for the roof support, the roof waterproof construction should be completed before the construction of the steel structure, and the waterproof layer should not be damaged during the construction of the steel structure.

If it affects the original roof's waterproof structure, waterproof treatment should be carried out according to the original waterproof structure.

The steel structure in contact with the roof shall be treated with anti-corrosion treatment.

The deviation of the roof foundation and embedded bolts of the zinc-aluminum-magnesium photovoltaic support should meet the regulations.


Our company: